Biomethane Insertion in the Piped Natural Gas Network in the State of Bahia – Brazil
Resumo
This study investigates the feasibility technical, economic and regulatory aspects of the introduction of biomethane in the headquarters energy of the state of Bahia, focusing in the distributor initiatives Bahiagás. The main objective is to assess whether the potential agricultural sector of the state estimated in more than 500 million Nm³/ year of biogas can be effectively converted in biomethane injectable in the natural gas network, considering you frames regulatory national and so-called public launched by the company. For this purpose, a revision systematics of literature scientific (Scielo, ScienceDirect, Scopus databases) and documents officers from the National Agency of Petroleum, Natural Gas and Biofuels (ANP), the Brazilian Association of Biogas and Biomethane (ABIOGÁS), the Ministry of Agriculture (MAPA), the Energy Research Company (EPE) and the companies themselves. Bahiagás notices (2022 and 2024). They were included only data with sources reliable, published between 2017 and 2025, with relevance direct to the context Brazilian and, preferably, to the Northeast region. The results point out that, although biomethane it is technically viable and have support normative robust (ANP Resolutions 886/2022 and 906/2022) and incentives financial via CBIOs (RenovaBio Law), the state of Bahia still no it has none unit producer operational according to ANP. The two calls Bahiagás public especially that of 2024, with a 10 - year contract and supply minimum of 5,000 m³/ day from 2027 onwards reveal a strong institutional interest, but also expose critical gaps: high investment costs (>R$ 15 million per average plant), absence of policies state support, logistics deficient waste collection and low training technique. The main conclusion is that, despite the enormous potential and conditions favorable, the implementation of biomethane in Bahia faces barriers institutional and structural that will beyond technology. To overcome them, it is essential to create a program state development, with lines of credit, assistance technique, centers collection regions. Without these measures, the 2027 commitment is at high risk of not being met.